Skip to content
Modern primary bathroom with floating double vanity, vessel sinks, and frosted glass shower.
Bathroom Remodeling

Bathroom Remodels That Hold Up for Decades

The difference between a bathroom that lasts 25 years and one that fails in 5 is mostly what happens under the tile. We do that part properly.

Overview

What this service actually is.

Most bathroom problems are not visible. Pan slope, waterproofing membranes, niche framing, valve placement, fan venting — these are the details that decide whether the bathroom holds up. We sequence and inspect each before tile sets.

Whether it's a primary suite, a guest bath, or a small powder room, we plan the layout, fixtures, lighting, and ventilation as one system, then build it with the same care you'd want for a kitchen.

What's included

  • Demo and disposal
  • Framing changes for niches, benches, and curbless showers
  • Plumbing rough-in (re-routed when needed)
  • Schluter / liquid waterproofing system, taped and tested
  • Tile, stone, and grout install
  • Vanity, mirror, and lighting placement
  • Exhaust fan sized for the room, ducted to exterior
  • Permits and inspections where required
Our process

How a bathroom remodeling project runs.

01

Consultation

We start with a no-pressure consultation — usually a walkthrough at your home — to understand how you use the space, the constraints, and what a successful bathroom remodel looks like for you.

02

Design & Scope

We translate the goals into drawings, materials, and a written scope with realistic line-item pricing. Nothing vague, nothing buried.

03

Permits & Pre-Construction

We pull permits, finalize selections, schedule trades, and protect the rest of your home before demolition. You receive a written timeline.

04

Build

One project manager, consistent crew, weekly written updates, and clean job sites. Inspections handled by us.

05

Punch List & Closeout

We walk the project with you, complete the punch list, hand over warranties and care guides, and stay reachable after closeout.

Common concerns

What homeowners ask before signing.

Will tile crack or grout fail over time?

Most failures come from substrate movement, missing waterproofing, or improper grout. We use uncoupling membranes on floors, fully waterproof wet walls and pans, and choose the right grout for the joint width.

Can you do curbless / zero-entry showers?

Yes. They require careful pan slope and drainage planning but are well within our standard scope when the framing allows.

How long does a bathroom remodel take?

Typical 3–6 weeks of active work depending on tile complexity and fixture lead times. We give you a written schedule before demo.

Where we work

Bathroom Remodeling across SoCal and the Bay Area.

Our SoCal office is in Van Nuys. Most bathroom remodeling projects we run are within the San Fernando Valley, Westside, Conejo Valley, Pasadena area, or — on the Bay Area side — across the Peninsula from San Mateo through San Jose.

See where we work →

License & trust

  • Licensed: CSLB #983927
  • 13 years in residential remodeling
  • Written, line-item scopes
  • One PM per project
  • Workmanship warranty in writing
FAQ

Frequently asked

Do you do small bathrooms?
Yes — guest baths and powder rooms regularly. We bring the same detailing as on larger jobs.
Can you match a historic look?
Yes. We are comfortable with classic American, Mediterranean, and modernist details when sources support it.
Do you handle plumbing relocations?
Yes, including drain relocations when the joist layout allows it.
What about ventilation?
Every bathroom we remodel gets a properly sized exhaust fan, ducted to the exterior — never into an attic.
Start your project

Let's talk through your bathroom remodeling.

Tell us about your space and timeline. We'll respond within one business day.

Call: 415-949-8903

We respond within one business day. By submitting this form you agree to be contacted about your project.

Call 415-949-8903